In commemoration of Labor Day, enjoy one of the best sales of the year. Browse wall art, home décor & more and save 20% off the purchase price now through Labor Day, Sept 2!
Boundary: Bleed area may not be visible.
by Gerry Gantt
$14.50
Size
Image Size
Product Details
Our spiral notebooks are 6" x 8" in size and include 120 pages which are lined on both sides. The artwork is printed on the front cover which is made of thick paper stock, and the back cover is medium gray in color. The inside of the back cover includes a pocket for storing extra paper and pens.
Design Details
2014 Photograph, Nymphaea Water Lily, (Nymphaea var.), Suan Luang Queen Sirikit, Chatuchak, Bangkok, Thailand, © 2014.
ภาพถ่าย... more
Ships Within
2 - 3 business days
2014 Photograph, Nymphaea Water Lily, (Nymphaea var.), Suan Luang Queen Sirikit, Chatuchak, Bangkok, Thailand, © 2014.
ภาพถ่าย ๒๕๕๗ ดอกบัว สวนสมเด็จพระนางเจ้าสิริกิติ์ฯ จตุจักร กรุงเทพฯ ประเทศไทย
Welcome to my Fine Art Photography website. If you don't see a photo here that you are interested in purchasing, please use the email link to send me a message, including the Code for the photo you want (Code will be something like DTHCM0582). I will add it to this site and send you an email reply with the link. Thank you very much and enjoy the site. If you are wondering what media would be best for a purchased photo, I highly recommend Fine Art America's Metal Prints. They are very sharp and brilliant, displaying all of the detail and color I try to capture in my photos. Hanging one of these Metal Prints on your wall is like hanging a window to the scene or object depicted. If you would like a more subdued effect, then a Gallery...
$14.50
There are no comments for Nymphaea Water Lily DTHB1633. Click here to post the first comment.