In commemoration of Labor Day, enjoy one of the best sales of the year. Browse wall art, home décor & more and save 20% off the purchase price now through Labor Day, Sept 2!

Previous PagePREV

|

NEXTNext Page
Scenic Tapestry featuring the photograph Wat San Sai Ton Kok Phra Ubosot Gable DTHCM1396 by Gerry Gantt

Boundary: Bleed area may not be visible.

Share This Page

Wat San Sai Ton Kok Phra Ubosot Gable DTHCM1396 Tapestry

Gerry Gantt

by Gerry Gantt

$41.00

Size

Orientation

Image Size

 
 

Product Details

Our lightweight, microfiber tapestries are available in three different sizes and feature incredible artwork to complement any wall space. Each tapestry has hemmed edges for secure hanging with nails and/or thumbtacks.

Design Details

2013 Photograph, Wat San Sai Ton Kok Phra Ubosot Gable, T. San Phi Suea, Mueang Chiang Mai, Chiang Mai, Thailand, © 2017.... more

Care Instructions

Machine wash cold and tumble dry with low heat.

Ships Within

1 - 2 business days

Additional Products

Wat San Sai Ton Kok Phra Ubosot Gable DTHCM1396 Photograph by Gerry Gantt

Photograph

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Canvas Print

Canvas Print

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Framed Print

Framed Print

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Art Print

Art Print

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Poster

Poster

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Metal Print

Metal Print

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Acrylic Print

Acrylic Print

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Wood Print

Wood Print

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Greeting Card

Greeting Card

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 iPhone Case

iPhone Case

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Throw Pillow

Throw Pillow

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Duvet Cover

Duvet Cover

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Shower Curtain

Shower Curtain

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Tote Bag

Tote Bag

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Round Beach Towel

Round Beach Towel

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Zip Pouch

Zip Pouch

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Beach Towel

Beach Towel

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Weekender Tote Bag

Weekender Tote Bag

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Portable Battery Charger

Portable Battery Charger

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Bath Towel

Bath Towel

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 T-Shirt

Apparel

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Coffee Mug

Coffee Mug

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Yoga Mat

Yoga Mat

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Spiral Notebook

Spiral Notebook

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Fleece Blanket

Fleece Blanket

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Tapestry

Tapestry

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Jigsaw Puzzle

Jigsaw Puzzle

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Sticker

Sticker

Wat San Sai Ton Kok Phra Ubosot Gable Dthcm1396 Ornament

Ornament

Tapestry Tags

tapestries scenic tapestries temple tapestries thailand tapestries

Photograph Tags

wall art photographs scenic photos temple photos thailand photos

Comments (0)

There are no comments for Wat San Sai Ton Kok Phra Ubosot Gable DTHCM1396.   Click here to post the first comment.

Artist's Description

2013 Photograph, Wat San Sai Ton Kok Phra Ubosot Gable, T. San Phi Suea, Mueang Chiang Mai, Chiang Mai, Thailand, © 2017.
ภาพถ่าย ๒๕๕๖ วัดสันทรายต้นกอก หน้าจั่ว พระอุโบสถ ต.สันผีเสื้อ อ.เมืองเชียงใหม่ จ.เชียงใหม่ ประเทศไทย

About Gerry Gantt

Gerry Gantt

Welcome to my Fine Art Photography website. If you don't see a photo here that you are interested in purchasing, please use the email link to send me a message, including the Code for the photo you want (Code will be something like DTHCM0582). I will add it to this site and send you an email reply with the link. Thank you very much and enjoy the site. If you are wondering what media would be best for a purchased photo, I highly recommend Fine Art America's Metal Prints. They are very sharp and brilliant, displaying all of the detail and color I try to capture in my photos. Hanging one of these Metal Prints on your wall is like hanging a window to the scene or object depicted. If you would like a more subdued effect, then a Gallery...

 

$41.00